About Subcontractor agreement construction paper

A subcontractor agreement is a legal document between a primary contractor and a subcontractor, outlining the terms and conditions under which the subcontractor will perform specific tasks as part of a larger project.

Subcontractor agreement

SUBCONTRACTOR CHECKLIST

Project:
Client Name: ________________________________LOCATION: _______________________________
Contractor:_________________________________________________________________________
Subcontractor:______________________________________________________________________
Date Start: __________________________________Target Date of Accomplishment:_______________________________

ARCHITECTURAL:

  • HOUSE CONSTRUCTION (LIVABLE AND USABLE AREAS
  • LANDSCAPING
  • FENCE AND GATE
  • OTHERS (PLEASE SPECIFY):__________________________________________________________________________________________________________________________________________________________________________________________________________________________

GROUND FLOOR

AREA(s)FINISHES AND INCLUSIONSTOTAL SQM (Measured wall to wall)
GROUND FLOOR  
LIVING AREA  Flooring -Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to swatch(s) given. -Use Tile adhesive -Use tile grout   Ceiling: Cove layout ( see working drawings for details) Use gypsum board ______ mm THK. Use metal furring for framing. Use skim coat for finishing Use flat white paint.   Walls: @ Exterior Walls Use 6’’ CHB plastered finish Use skim coat Use flat white latex paint primer Use semi-gloss paint for finishing Rebars: Specified @ drawings.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule shown @ drawings. Use Royu brand switches and convenience outlet (No. Will be based on drawings, BOM and BOQ given.) -Include panel Board.   
DINING AREAFlooring: -Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to swatch(s) given). -Use Tile adhesive -Use tile grout   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Layout please based on working drawings -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule shown @ drawings.       
KITCHEN AREA        FLOORING: -Use 60 x 60 cm Vitrified Tiles/Non- Slip Tiles (Color/ Design refer to swatch(s) given. -Use Tile adhesive -Use tile grout   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Flat Ceiling -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans, load computation and schedule shown @ drawings. Use Royu brand switches and convenience outlet. (No. Will be based on drawings, BOM and BOQ given.) Include panel Board.   Plumbing: Use specified sanitary pipes and fittings @ BOM, BOQ and Working Drawings. Use specified waterline pipes and fittings @ BOM, BOQ and Working Drawings.   Inclusions:1.80 li. mts. Cabinets -Use ¾ “ Marine Plywood – Use Laminate Finish (Color/ Design refer to swatch(s) given). -1.80 li. mts. Hanging Cabinets -Use ¾ “ Marine Plywood – Use Laminate Finish (Color/ Design refer to swatch(s) given). -Fixture Inclusion 1-sink (Single-Tub w/ Drain) 1-Single lever kitchen faucet (gooseneck)       
POWDER ROOM/ T&BFlooring: Use 30 cm x 30 cm non-slip tiles (Color/ Design refer to swatch(s) given.) -Use Tile adhesive -Use tile grout   Walls: -Use 4’’ CHB wall -Use 30 cm x 60 cm glazed tiles (Color/ Design refer to swatch(s) given.)for Finishing -Use tile adhesive -Use tile Grout   Ceiling: Flat Ceiling -Use 3.5 mm THK HardieFlex or approved as equal plaster board. -Use metal furring for framing. -Use skim coat for finishing -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans, load computation and schedule Shown @ drawings. Use Royu brand switches and convenience outlet. (No. Will be based on drawings, BOM and BOQ given.) Include panel Board.   Plumbing: Use specified sanitary pipes and fittings @ BOM, BOQ and Working Drawings. Use specified waterline pipes and fittings @ BOM, BOQ and Working Drawings.   Inclusions: (Cool or Pozzi  Brand or Approved as equal) Fixtures: Wall hang lavatory Water Closet Bidet Spray Faucet ( Single handle basin mixer faucet) as indicated number(s) Telephone Shower (if included @ draings) Appurtenances: Soap and Tissue Holder Fittings     
SERVICE AREAFlooring: Concrete Pavement @ Counter top 60 cm X 60 cm tiles @Depressed at sink area   PLUMBING: -Hose bibb and roughing-in 
PORCHConcrete pavement 
LANAIConcrete pavement 
CARPORTFlooring: Concrete Pavement PLUMBING: -Hose bibb and roughing-in 
MAID’S ROOM  Flooring: – HDF Wood Laminate 194 x 1212 x 8mm (color/design as per approved swatch of client) -Use –Use adhesive based on installation process required.   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Layout please based on working drawings -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing. -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule shown @ drawings.   
MASTER BEDROOMFlooring: – HDF Wood Laminate 194 x 1212 x 8mm (color/design as per approved swatch of client) -Use –Use adhesive based on installation process required.   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Layout please based on working drawings -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing. -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans, load computation and schedule shown @ drawings.   
MASTER WALK IN CLOSETFlooring: – HDF Wood Laminate 194 x 1212 x 8mm (color/design as per approved swatch of client) -Use –Use adhesive based on installation process required.   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Layout please based on working drawings -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing. -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule shown @ drawings.   INCLUSIONS:   1.2 MTS WIDTH CABINET -Use ¾” Marine Plywood -Use Laminate for finish ( Color /Design as approved swatch)   
MASTER T&BFlooring: Use 30 cm x 30 cm non-slip tiles (Color/ Design refer to swatch(s) given.) -Use Tile adhesive -Use tile grout -Use waterproofing   Walls: -Use 4’’ CHB wall -Use 30 cm x 60 cm glazed tiles (Color/ Design refer to swatch(s) given.)for Finishing -Use tile adhesive -Use tile Grout   Ceiling: Flat Ceiling -Use 3.5 mm THK HardieFlex or approved as equal plaster board. -Use metal furring for framing. -Use skim coat for finishing -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule Shown @ drawings. Use Royu brand switches and convenience outlet. (No. Will be based on drawings, BOM and BOQ given.) Include panel Board.   Plumbing: Use specified sanitary pipes and fittings @ BOM, BOQ and Working Drawings. Use specified waterline pipes and fittings @ BOM, BOQ and Working Drawings.   Inclusions: (Cool or Pozzi  Brand or Approved as equal) Fixtures: Pedestal type  lavatory Water Closet Bidet Spray Faucet ( Single handle basin mixer faucet) Telephone Shower   Appurtenances: Soap and Tissue Holder Fittings     
__ BEDROOM (S)Flooring: – HDF Wood Laminate 194 x 1212 x 8mm (color/design as per approved swatch of client) -Use –Use adhesive based on installation process required.   Walls: @ Exterior Walls -Use 6’’ CHB plastered finish -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Rebars: Specified @ drawings.   @Interior Walls -Use 6 mm HardieFlex or approved as equal drywall -Use skim coat -Use flat white latex paint primer -Use semi-gloss paint for finishing -Use studs and tracks (see drawings for details) Note: Except toilet and bath(s) and Powder Room(s).   Ceiling: Flat Ceiling -Use gypsum board ______ mm THK. -Use metal furring for framing. -Use skim coat for finishing. -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans, load computation and schedule shown @ drawings.   INCLUSIONS:   0.80 MTS WIDTH CABINET -Use ¾” Marine Plywood -Use Laminate for finish ( Color /Design as approved swatch)     
COMMON T&BFlooring: Use 30 cm x 30 cm non-slip tiles (Color/ Design refer to swatch(s) given.) -Use Tile adhesive -Use waterproofing -Use tile grout   Walls: -Use 4’’ CHB wall -Use 30 cm x 60 cm glazed tiles (Color/ Design refer to swatch(s) given.)for Finishing -Use tile adhesive -Use tile Grout   Ceiling: Flat Ceiling -Use 3.5 mm THK HardieFlex or approved as equal plaster board. -Use metal furring for framing. -Use skim coat for finishing -Use flat white paint.   Electrical: Roughing-in based on schedule and lay-out based on electrical plans,load computation and schedule Shown @ drawings. Use Royu brand switches and convenience outlet. (No. Will be based on drawings, BOM and BOQ given.) Include panel Board.   Plumbing: Use specified sanitary pipes and fittings @ BOM, BOQ and Working Drawings. Use specified waterline pipes and fittings @ BOM, BOQ and Working Drawings.   Inclusions: (Cool or Pozzi  Brand or Approved as equal) Fixtures: Pedestal type  lavatory Water Closet Bidet Spray Faucet ( Single handle basin mixer faucet) Telephone Shower   Appurtenances: Soap and Tissue Holder Fittings   
BALCONYFLOORING: -Use plain concrete pavement -Use waterproofing RAILING -Use 2” x 2” tubular painted. 
ROOFING-Use gauge 24 pre-painted long span roofing. -Use reflective bubble insulation.     
WINDOWS-Use 6mm THK. Anneal glass (or shaded) in Aluminum Frame Powder Coated – Note: In larger span of glass 6 mm Tempered Glass must to use. 
STAIRS-Concrete Stairs -Use Wood Planks on stair treads. -Use 2”X2” tubular railing or s specified to drawings. -Use Wooden millwork on handrail top 
EXTERIOR FINISHINGAs shown in drawings Note: This may include claddings, wood and tiles. 
EAVES-Use 3.5mm THK HARDIEFLEX OR APPROVED AS EQUAL PLASTER BOARD. -Use plain White Paint/ Wood Stain if specified.   
DOORS-As reflected to the Schedule of doors and windows. 
NOTES:                                          

Construction of _____________________________________________________________________

                                                                                        (Project Nature)

At ________________________________________________________________________________

                                                                          (Location)

SUB-CONTRACTOR AGREEMENT

THIS AGREEMENT is made ___________________between _________________________________

                                                                          (Date)

____________________________________________________ (Hereafter, called “CONTRACTOR”),

                   (Company Name and Address- Main Contractor)

and_______________________________________________________________________________

          (Company Name and Address- Sub-Contractor)

(Hereafter, called “THE SUB-CONTRACTOR”), of the mentioned part above.

In consideration of payment to be made by the Contractor to the Sub-Contractor, the Sub-Contractor hereby covenants with the Contractor to execute, complete and maintain the Sub-Contract works in conformity in all respects with the terms and conditions of this Agreement.

In WITNESS thereof the Contractor and the Sub-Contractor have hereunto set their respective hands the day and the year first above written.

Authorized Signatory

On Behalf of the Sub-Contractor

____________________________

  Authorized Signatory

On Behalf of the Contractor

____________________________

       Printed Name and Signature                                                         Printed Name and Signature

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top